Two markers on the same axis show our value vs. industry average/target across 2-3 horizontal gauge bars. The gap between markers is labeled in percentage points, with a risk-summary badge at the bottom.
Best for: Problem framing before market entry, quantitative urgency for fundraising, background justification for improvement projects.
Use: Present the gap between our numbers and industry standard/target as the problem itself. Problem definition before market entry, quantitative evidence in fundraising decks.
Avoid: For the same subject changing over time (not an external benchmark), use comparison-before-after. For 2D risk prioritization, use problem-risk-matrix.
CategoryProblem / Solution
DensityMedium
Text Budget260 chars
EmphasisVisual
PositionMiddle
03
Theme
Based on the currently selected theme Slate Pro. Switching the theme in the sidebar updates this section too.
SchemeLight
Best forGeneral business presentations, SaaS product introductions, corporate proposals, B2B pitch decks
Avoid forCreative/art presentations, when a dark mood is needed
04
Slots (17)
titleRequired
Aa
Slide title30 chars
subtitle
Subtitle/description sentence80 chars
metric1_labelRequired
Label
Metric 1 label12 chars
metric1_usRequired
128%
Metric 1 our value (ex: Us 32%)16 chars
metric1_benchmarkRequired
128%
Metric 1 industry benchmark value16 chars
metric1_gapRequired
128%
Metric 1 gap (ex: -36pp)8 chars
metric2_labelRequired
Label
Metric 2 label12 chars
metric2_usRequired
128%
Metric 2 our value16 chars
metric2_benchmarkRequired
128%
Metric 2 industry benchmark value16 chars
metric2_gapRequired
128%
Metric 2 gap8 chars
metric3_label
Label
Metric 3 label12 chars
metric3_us
128%
Metric 3 our value16 chars
metric3_benchmark
128%
Metric 3 industry benchmark value16 chars
metric3_gap
128%
Metric 3 gap8 chars
summary_badgeRequired
One-line summary of the risk/opportunity cost the gap implies60 chars